| Assessment Year | 2021 |
|---|---|
| Principal Product | Treated Water |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $5 M to 10M |
| # of Employees | 10 |
| Plant Area |
652,200
ft2
|
| Annual Production | 1,100,000
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $422,235 | 4,114,377 |
kWh
|
$0.10 | |
| Electricity Demand | $176,833 | 5,988 |
kW-mo/yr
|
$29.53 | |
| Waste Disposal Costs | |||||
| Solid Waste (haz) | $31,000 | 300,000 |
lb
|
$0.10 | |
| TOTAL YEARLY COSTS | $630,068 | ||||
| RECOMMENDED SAVINGS* | $413,825 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,567 | - | - |
$8,129
-
kW-mo/yr
|
$438 | - | - | - | |
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $72,559 | $11,960 |
$54,950
535,418
kWh
|
$17,609
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $126,207 | $44,180 |
$95,579
931,300
kWh
|
$30,628
-
kW-mo/yr
|
- | - | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,474 | $38,541 |
$10,018
97,608
kWh
|
$5,435
-
kW-mo/yr
|
- | - | $1,098 | $923 | |
| 05 | 2.9141: Install anaerobic digester | $189,018 | $1,222,260 |
$126,296
1,230,600
kWh
|
$36,972
-
kW-mo/yr
|
- |
$25,750
-
lb
|
- | - | |
| TOTAL RECOMMENDED | $413,825 | $1,316,941 |
$286,843
2,794,926
kWh
|
$98,773
-
kW-mo/yr
|
$438 |
$25,750
-
lb
|
$1,098 | $923 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs