Assessment Year | 1996 |
---|---|
Principal Product | Frozen desserts |
NAICS |
n/a
|
SIC | 2024: Ice Cream and Frozen Desserts |
Sales Range | $50 M to 100M |
# of Employees | 140 |
Plant Area |
158,000
ft2
|
Annual Production | 12,500
Tgal
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $582,310 | 16,487,984 |
kWh
|
$0.035 |
Electricity Demand | $237,130 | 36,363 |
kW-mo/yr
|
$6.52 |
Natural Gas | $45,273 | 9,194 |
MMBtu
|
$4.92 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,440 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $57,300 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $43,960 | $40,000 | - |
$43,960
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $1,860 | $500 | - | - |
$1,860
-
MMBtu
|
- | - | - | |
03 | 2.2136: Install / repair insulation on steam lines | $1,940 | $4,320 |
$370
16,706
kWh
|
$310
-
kW-mo/yr
|
$1,260
-
MMBtu
|
- | - | - | |
04 | 2.2135: Repair and eliminate steam leaks | $1,570 | $100 | - | - |
$1,570
-
MMBtu
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,140 | $1,180 |
$200
9,086
kWh
|
$150
-
kW-mo/yr
|
- | - | - | $790 | |
06 | 3.4154: Eliminate leaks in water lines and valves | $5,900 | $100 | - | - | - |
$5,900
-
Tgal
|
- | - | |
07 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $2,070 | - | - | - | - | - |
$2,070
-
lb
|
- | |
TOTAL RECOMMENDED | $58,440 | $46,200 |
$570
25,792
kWh
|
$44,420
-
kW-mo/yr
|
$4,690
-
MMBtu
|
$5,900
-
Tgal
|
$2,070
-
lb
|
$790 | ||
TOTAL IMPLEMENTED | $57,300 | $45,020 |
$370
16,706
kWh
|
$44,270
-
kW-mo/yr
|
$4,690
-
MMBtu
|
$5,900
-
Tgal
|
$2,070
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs