Assessment Year 1996
Principal Product Frozen desserts
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $50
M
to 100
M
# of Employees 140
Plant Area 158,000
ft2
Annual Production 12,500
Tgal
Production Hrs. Annual 7,488
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $582,310 16,487,984
kWh
Electricity Demand $237,130 36,363
kW-mo/yr
Natural Gas $45,273 9,194
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $58,440 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $57,300

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $43,960 $40,000 - $43,960
-
kW-mo/yr
- - - -
02 2.1233: Analyze flue gas for proper air/fuel ratio $1,860 $500 - - $1,860
-
MMBtu
- - -
03 2.2136: Install / repair insulation on steam lines $1,940 $4,320 $370
16,706
kWh
$310
-
kW-mo/yr
$1,260
-
MMBtu
- - -
04 2.2135: Repair and eliminate steam leaks $1,570 $100 - - $1,570
-
MMBtu
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,140 $1,180 $200
9,086
kWh
$150
-
kW-mo/yr
- - - $790
06 3.4154: Eliminate leaks in water lines and valves $5,900 $100 - - - $5,900
-
Tgal
- -
07 3.5212: Regrind, reuse, or sell scrap plastic parts $2,070 - - - - - $2,070
-
lb
-
TOTAL RECOMMENDED $58,440 $46,200 $570
25,792
kWh
$44,420
-
kW-mo/yr
$4,690
-
MMBtu
$5,900
-
Tgal
$2,070
-
lb
$790
TOTAL IMPLEMENTED $57,300 $45,020 $370
16,706
kWh
$44,270
-
kW-mo/yr
$4,690
-
MMBtu
$5,900
-
Tgal
$2,070
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs