ITAC Assessment: SD0473
ITAC logo
ITAC Assessment: SD0473
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Honycomb Composities
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 300
Plant Area 109,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $435,060 5,435,214
kWh
Electricity Demand $156,366 12,579
kW-mo/yr
Electricity Fees $28,399 -
Natural Gas $418,077 85,094
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,311 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,408

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2511: Insulate bare equipment $13,184 $13,290 - - $13,184
-
MMBtu
02 2.2121: Increase amount of condensate returned $9,120 $8,000 - - $9,120
-
MMBtu
03 2.2162: Reduce excess steam bleeding $8,903 $24,743 - - $8,903
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,042 $500 $7,042
88,028
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,946 $9,300 $5,275
65,934
kWh
$671
-
kW-mo/yr
-
06 2.7134: Use photocell controls $4,729 $6,475 $4,196
52,456
kWh
$533
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $4,448 $11,250 $3,460
43,242
kWh
$988
-
kW-mo/yr
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,017 $500 $3,519
43,974
kWh
$498
-
kW-mo/yr
-
09 2.2135: Repair and eliminate steam leaks $1,067 $400 - - $1,067
-
MMBtu
10 2.7135: Install occupancy sensors $1,066 $2,700 $1,066
13,325
kWh
- -
11 2.4239: Eliminate or reduce compressed air usage $789 $1,300 $624
7,799
kWh
$165
-
kW-mo/yr
-
TOTAL RECOMMENDED $60,311 $78,458 $25,182
314,758
kWh
$2,855
-
kW-mo/yr
$32,274
-
MMBtu
TOTAL IMPLEMENTED $32,408 $51,483 $7,603
95,015
kWh
$1,651
-
kW-mo/yr
$23,154
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs