ITAC Assessment: SF0553
ITAC logo
ITAC Assessment: SF0553
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product In-Shell Walnuts, raw walnuts, walnut oil
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 40,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 5,136
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,530 811,604
kWh
Electricity Demand $71,534 4,308
kW-mo/yr
LPG $32,926 1,715
MMBtu
Waste Disposal Costs
Water Usage $10,000 500
Tgal
TOTAL YEARLY COSTS $214,990
RECOMMENDED SAVINGS* $121,645 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $121,645

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,333 - $4,413
35,627
kWh
- $(-1,080.0) -
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,905 $120 $2,447
19,757
kWh
$458
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $289 $41 $289
2,329
kWh
- - -
04 2.7229: Air condition only space necessary $2,096 $2,344 $2,096
16,918
kWh
- - -
05 2.7135: Install occupancy sensors $12,409 $22,495 $8,971
72,426
kWh
$2,590
-
kW-mo/yr
$674 $174
06 2.9114: Use solar heat to make electricty $100,613 $451,750 $70,737
571,057
kWh
$29,876
-
kW-mo/yr
- -
TOTAL RECOMMENDED $121,645 $476,750 $88,953
718,114
kWh
$32,924
-
kW-mo/yr
$(-406.0) $174
TOTAL IMPLEMENTED $121,645 $476,750 $88,953
718,114
kWh
$32,924
-
kW-mo/yr
$(-406.0) $174
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs