Assessment Year | 2020 |
---|---|
Principal Product | In-Shell Walnuts, raw walnuts, walnut oil |
NAICS | 311911: Roasted Nuts and Peanut Butter Manufacturing |
SIC | 2068: Salted and Roasted Nuts and Seeds |
Sales Range | $10 M to 50M |
# of Employees | 60 |
Plant Area |
40,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 5,136
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $100,530 | 811,604 |
kWh
|
$0.12 | |
Electricity Demand | $71,534 | 4,308 |
kW-mo/yr
|
$16.60 | |
LPG | $32,926 | 1,715 |
MMBtu
|
$19.20 | |
Waste Disposal Costs | |||||
Water Usage | $10,000 | 500 |
Tgal
|
$20.00 | |
TOTAL YEARLY COSTS | $214,990 | ||||
RECOMMENDED SAVINGS* | $121,645 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $121,645 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,333 | - |
$4,413
35,627
kWh
|
- | $(-1,080.0) | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,905 | $120 |
$2,447
19,757
kWh
|
$458
-
kW-mo/yr
|
- | - | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $289 | $41 |
$289
2,329
kWh
|
- | - | - | |
04 | 2.7229: Air condition only space necessary | $2,096 | $2,344 |
$2,096
16,918
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $12,409 | $22,495 |
$8,971
72,426
kWh
|
$2,590
-
kW-mo/yr
|
$674 | $174 | |
06 | 2.9114: Use solar heat to make electricty | $100,613 | $451,750 |
$70,737
571,057
kWh
|
$29,876
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $121,645 | $476,750 |
$88,953
718,114
kWh
|
$32,924
-
kW-mo/yr
|
$(-406.0) | $174 | ||
TOTAL IMPLEMENTED | $121,645 | $476,750 |
$88,953
718,114
kWh
|
$32,924
-
kW-mo/yr
|
$(-406.0) | $174 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs