ITAC Assessment: SF0548
ITAC logo
ITAC Assessment: SF0548
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Fabricated Metal Products
NAICS 332999: All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3499: Fabricated Metal Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 65,000
ft2
Annual Production 25,000
units
Production Hrs. Annual 4,394
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $132,823 639,172
kWh
Electricity Demand $26,504 1,478
kW-mo/yr
TOTAL YEARLY COSTS $159,327
RECOMMENDED SAVINGS* $53,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $53,417

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,764 - $5,364
25,815
kWh
- $(-600.0)
02 2.4221: Install compressor air intakes in coolest locations $193 - $193
931
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $473 $100 $473
2,277
kWh
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,363 $300 $1,752
8,431
kWh
$611
-
kW-mo/yr
-
05 2.7224: Reduce space conditioning during non-working hours $4,653 $1,103 $4,653
22,391
kWh
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,047 $2,930 $803
3,863
kWh
$243
-
kW-mo/yr
$1
07 2.9114: Use solar heat to make electricty $39,924 $172,115 $39,924
192,125
kWh
- -
TOTAL RECOMMENDED $53,417 $176,548 $53,162
255,833
kWh
$854
-
kW-mo/yr
$(-599.0)
TOTAL IMPLEMENTED $53,417 $176,548 $53,162
255,833
kWh
$854
-
kW-mo/yr
$(-599.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs