| Assessment Year | 2017 |
|---|---|
| Principal Product | Coconut oil, flour, and sugar; chia seeds; hemp seeds; superfoods |
| NAICS | 311224: Soybean and Other Oilseed Processing |
| SIC | 2076: Vegetable Oil Mills, Except Corn, Cottonseed, and Soybean |
| Sales Range | $50 M to 100M |
| # of Employees | 120 |
| Plant Area |
130,000
ft2
|
| Annual Production | 8,000,000
units
|
| Production Hrs. Annual | 4,335
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $97,922 | 772,233 |
kWh
|
$0.13 |
| Electricity Demand | $32,171 | 2,172 |
kW-mo/yr
|
$14.81 |
| Electricity Fees | $29,787 | - |
|
- |
| Natural Gas | $6,051 | 467 |
MMBtu
|
$12.96 |
| Other Energy | $14,157 | 409 |
MMBtu
|
$34.61 |
| TOTAL YEARLY COSTS | $180,088 | |||
| RECOMMENDED SAVINGS* | $163,134 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,594 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7224: Reduce space conditioning during non-working hours | $4,520 | - |
$1,991
11,538
kWh
|
- |
$2,529
-
MMBtu
|
- | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $1,047 | - | - |
$1,047
-
kW-mo/yr
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $777 | $84 |
$633
3,704
kWh
|
$144
-
kW-mo/yr
|
- | - | |
| 04 | 2.6231: Utilize controls to operate equipment only when needed | $7,074 | $1,769 |
$7,074
41,363
kWh
|
- | - | - | |
| 05 | 2.1332: Convert combustion equipment to burn natural gas | $2,356 | $1,821 | - | - |
$(-1,414.0)
-
MMBtu
|
$3,770
-
MMBtu
|
|
| 06 | 2.9114: Use solar heat to make electricty | $147,360 | $665,154 |
$121,199
708,683
kWh
|
$26,161
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $163,134 | $668,828 |
$130,897
765,288
kWh
|
$27,352
-
kW-mo/yr
|
$1,115
-
MMBtu
|
$3,770
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $11,594 | $1,769 |
$9,065
52,901
kWh
|
- |
$2,529
-
MMBtu
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs