ITAC Assessment: SF0498
ITAC logo
ITAC Assessment: SF0498
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Wood and Plastic Store Fixtures for Retail Displays
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 100,000
ft2
Annual Production 500,000
units
Production Hrs. Annual 2,808
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,057 934,777
kWh
Electricity Demand $33,438 4,568
kW-mo/yr
Waste Disposal Costs
Solid Waste (non-haz) $42,311 1,461,532
lb
TOTAL YEARLY COSTS $181,806
RECOMMENDED SAVINGS* $127,511 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,784

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,101 - $4,941
43,552
kWh
- $(-840.0) - -
02 2.6212: Turn off equipment during breaks, reduce operating time $339 - $339
2,988
kWh
- - - -
03 2.7224: Reduce space conditioning during non-working hours $13,580 $177 $13,580
119,691
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,342 $210 $1,052
9,274
kWh
$290
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $417 $178 $130
1,142
kWh
$287
-
kW-mo/yr
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,025 $3,196 $1,500
13,223
kWh
- $290 - $235
07 2.4224: Upgrade controls on compressors $8,507 $21,536 $8,507
74,977
kWh
- - - -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $15,733 $56,494 $12,095
106,601
kWh
$3,638
-
kW-mo/yr
- - -
09 2.9114: Use solar heat to make electricty $65,652 $583,671 $56,314
496,335
kWh
$9,338
-
kW-mo/yr
- - -
10 3.6193: Install equipment (eg compactor) to reduce disposal costs $15,815 $27,742 $(-245.0)
(-2,159)
kWh
$(-728.0)
-
kW-mo/yr
- $16,788 -
TOTAL RECOMMENDED $127,511 $693,204 $98,213
865,624
kWh
$12,825
-
kW-mo/yr
$(-550.0) $16,788 $235
TOTAL IMPLEMENTED $44,784 $52,829 $28,752
253,414
kWh
$(-441.0)
-
kW-mo/yr
$(-550.0) $16,788 $235
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings