ITAC Assessment: SF0496
ITAC logo
ITAC Assessment: SF0496
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product wastewater, recycled water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 25
Plant Area 741,826
ft2
Annual Production 3,250,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $830,560 8,174,462
kWh
Electricity Demand $337,325 15,086
kW-mo/yr
TOTAL YEARLY COSTS $1,167,885
RECOMMENDED SAVINGS* $207,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,126

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $852 $90 $655
6,446
kWh
$197
-
kW-mo/yr
- - -
02 2.6231: Utilize controls to operate equipment only when needed $1,991 $546 $1,991
19,605
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $22,454 $23,168 $19,293
189,893
kWh
$3,505
-
kW-mo/yr
- $1,585 $(-1,929.0)
04 2.7135: Install occupancy sensors $1,681 $3,001 $1,277
12,567
kWh
$404
-
kW-mo/yr
- - -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,437 $21,315 $4,947
48,690
kWh
$1,490
-
kW-mo/yr
- - -
06 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $4,855 $20,327 $4,855
47,785
kWh
- - - -
07 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $169,204 $790,554 $272,383
2,680,938
kWh
$82,397
-
kW-mo/yr
$(-59,003.0)
-
MMBtu
$(-126,573.0) -
TOTAL RECOMMENDED $207,474 $859,001 $305,401
3,005,924
kWh
$87,993
-
kW-mo/yr
$(-59,003.0)
-
MMBtu
$(-124,988.0) $(-1,929.0)
TOTAL IMPLEMENTED $26,126 $26,715 $22,561
222,065
kWh
$3,909
-
kW-mo/yr
- $1,585 $(-1,929.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs