ITAC Assessment: SF0486
ITAC logo
ITAC Assessment: SF0486
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product canned olives
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 57,000
ft2
Annual Production 23,725
units
Production Hrs. Annual 2,520
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $710,861 7,816,909
kWh
Electricity Demand $532,593 19,458
kW-mo/yr
Electricity Fees $24,255 -
Natural Gas $324,590 72,803
MMBtu
Waste Disposal Costs
Water Usage $38,088 572,194
Tgal
TOTAL YEARLY COSTS $1,630,387
RECOMMENDED SAVINGS* $166,614 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $84,962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
01 2.6218: Turn off equipment when not in use $833 - $833
9,164
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,280 - $2,280
32,457
kWh
- - -
03 2.2111: Install steam trap $59,001 $20,027 - - $58,930
-
MMBtu
$71
-
Tgal
04 2.4224: Upgrade controls on compressors $60,071 $20,763 $60,071
660,561
kWh
- - -
05 2.2511: Insulate bare equipment $1,616 $1,456 - - $1,616
-
MMBtu
-
06 2.2449: Recover heat from exhausted steam, hot air or hot water $21,035 $22,499 - - $21,035
-
MMBtu
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,334 $11,830 $3,893
42,807
kWh
$2,441
-
kW-mo/yr
- -
08 2.7135: Install occupancy sensors $15,444 $46,053 $8,074
88,787
kWh
$7,370
-
kW-mo/yr
- -
TOTAL RECOMMENDED $166,614 $122,628 $75,151
833,776
kWh
$9,811
-
kW-mo/yr
$81,581
-
MMBtu
$71
-
Tgal
TOTAL IMPLEMENTED $84,962 $78,646 $75,151
833,776
kWh
$9,811
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs