ITAC Assessment: MA0759
ITAC logo
ITAC Assessment: MA0759
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Thermoform plastic parts
NAICS 326113: Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081: Unsupported Plastics Film and Sheet
Sales Range $10
M
to 50
M
# of Employees 78
Plant Area 60,000
ft2
Annual Production 1,500,000
lb
Production Hrs. Annual 4,335
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $141,315 1,118,800
kWh
Electricity Demand $16,691 4,258
kW-mo/yr
Natural Gas $17,099 1,511
MMBtu
Waste Disposal Costs
Water Usage $5,200 40,392
Tgal
TOTAL YEARLY COSTS $180,305
RECOMMENDED SAVINGS* $18,029 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7314: Reduce ventilation air $11,226 $14,820 $6,030
47,855
kWh
$5,196
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,476 $6,333 $4,476
35,460
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,502 $3,367 $1,502
11,922
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $825 $6,402 $825
6,546
kWh
-
TOTAL RECOMMENDED $18,029 $30,922 $12,833
101,783
kWh
$5,196
-
MMBtu
TOTAL IMPLEMENTED $6,803 $16,102 $6,803
53,928
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs