ITAC Assessment: SF0484
ITAC logo
ITAC Assessment: SF0484
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Sound Equipment
NAICS 334310: Audio and Video Equipment Manufacturing
SIC 3651: Household Audio and Video Equipment
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 165,000
ft2
Annual Production 5,000
units
Production Hrs. Annual 2,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $349,488 1,656,422
kWh
Electricity Demand $54,021 3,514
kW-mo/yr
Natural Gas $45,994 4,181
MMBtu
TOTAL YEARLY COSTS $449,503
RECOMMENDED SAVINGS* $92,565 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $89,361

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings By-product Production Savings
01 2.7224: Reduce space conditioning during non-working hours $39,292 - $24,141
114,417
kWh
- $15,151
-
MMBtu
-
02 2.4226: Use / purchase optimum sized compressor $2,860 $954 $1,990
9,432
kWh
$870
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $43,008 $60,348 $32,599
154,504
kWh
$9,434
-
kW-mo/yr
- $975
04 2.4231: Reduce the pressure of compressed air to the minimum required $344 $1,296 $239
1,135
kWh
$105
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $7,061 $29,179 $4,825
22,868
kWh
$2,236
-
kW-mo/yr
- -
TOTAL RECOMMENDED $92,565 $91,777 $63,794
302,356
kWh
$12,645
-
kW-mo/yr
$15,151
-
MMBtu
$975
TOTAL IMPLEMENTED $89,361 $89,527 $61,565
291,789
kWh
$11,670
-
kW-mo/yr
$15,151
-
MMBtu
$975