ITAC Assessment: SF0480
ITAC logo
ITAC Assessment: SF0480
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Processed almonds
NAICS 115114: Postharvest Crop Activities (except Cotton Ginning)
SIC 0723: Crop Preparation Services for Market, Except Cotton Ginning
Sales Range $100
M
to 500
M
# of Employees 100
Plant Area 85,000
ft2
Annual Production 20,000,000
lb
Production Hrs. Annual 4,096
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $136,273 1,386,317
kWh
Electricity Demand $82,728 5,514
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $129,754 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,903

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $2,228 - $1,186
12,061
kWh
$1,042
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $187 - $187
1,905
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,403 $354 $3,734
37,985
kWh
$1,669
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,097 $219 $867
8,819
kWh
$230
-
kW-mo/yr
- -
05 2.6231: Utilize controls to operate equipment only when needed $6,005 $4,163 $6,005
61,086
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,322 $10,120 $4,207
42,799
kWh
$1,115
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,524 $22,649 $4,281
43,546
kWh
$2,557
-
kW-mo/yr
$282 $(-596.0)
08 2.7135: Install occupancy sensors $6,041 $31,062 $3,425
34,845
kWh
$2,616
-
kW-mo/yr
- -
09 2.9114: Use solar heat to make electricty $96,947 $904,867 $69,313
705,121
kWh
$27,634
-
kW-mo/yr
- -
TOTAL RECOMMENDED $129,754 $973,434 $93,205
948,167
kWh
$36,863
-
kW-mo/yr
$282 $(-596.0)
TOTAL IMPLEMENTED $111,903 $936,502 $78,712
800,736
kWh
$33,191
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs