ITAC Assessment: SF0472
ITAC logo
ITAC Assessment: SF0472
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 120,000
ft2
Annual Production 680,000
units
Production Hrs. Annual 3,850
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $131,240 1,245,080
kWh
Electricity Demand $36,332 5,220
kW-mo/yr
Natural Gas $20,058 1,912
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,605 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,360

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Primary Raw Material Savings
01 2.4226: Use / purchase optimum sized compressor $2,587 $527 $2,370
22,482
kWh
$217
-
kW-mo/yr
- -
02 2.6218: Turn off equipment when not in use $3,897 $6,325 $3,621
34,350
kWh
$276
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $1,873 $4,287 $1,392
13,203
kWh
$481
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $7,003 $19,142 $4,529
42,970
kWh
$512
-
kW-mo/yr
$694 $1,268
05 2.4322: Use or replace with energy efficient substitutes $4,245 $18,586 $3,894
36,943
kWh
$351
-
kW-mo/yr
- -
TOTAL RECOMMENDED $19,605 $48,867 $15,806
149,948
kWh
$1,837
-
kW-mo/yr
$694 $1,268
TOTAL IMPLEMENTED $15,360 $30,281 $11,912
113,005
kWh
$1,486
-
kW-mo/yr
$694 $1,268
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs