ITAC Assessment: SF0471
ITAC logo
ITAC Assessment: SF0471
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Bread and Bun
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $50
M
to 100
M
# of Employees 245
Plant Area 71,000
ft2
Annual Production 90,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $750,828 7,942,801
kWh
Electricity Demand $78,052 17,604
kW-mo/yr
Natural Gas $437,868 51,365
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,533 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $5,634 - $5,304
50,323
kWh
$330
-
kW-mo/yr
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $554 $134 $554
5,251
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $17,492 $23,804 $17,492
165,958
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $25,853 $50,144 - - $25,853
-
MMBtu
TOTAL RECOMMENDED $49,533 $74,082 $23,350
221,532
kWh
$330
-
kW-mo/yr
$25,853
-
MMBtu
TOTAL IMPLEMENTED $554 $134 $554
5,251
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs