ITAC Assessment: SF0469
ITAC logo
ITAC Assessment: SF0469
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 70
Plant Area 60,000
ft2
Annual Production 150,000
pieces
Production Hrs. Annual 3,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $197,841 1,252,287
kWh
Electricity Demand $57,026 4,735
kW-mo/yr
Natural Gas $30,610 3,123
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,941

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
01 2.6218: Turn off equipment when not in use $1,953 - - - $1,953
-
MMBtu
- -
02 2.2691: Shut off cooling if cold outside air will cool process $6,607 $2,460 $6,607
41,843
kWh
- - - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $152 $85 $152
965
kWh
- - - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,689 $8,237 $3,332
21,102
kWh
$357
-
kW-mo/yr
- - -
05 2.6231: Utilize controls to operate equipment only when needed $660 $1,671 $660
4,182
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $14,789 $82,161 $11,311
71,636
kWh
$1,912
-
kW-mo/yr
- $1,777 $(-211.0)
TOTAL RECOMMENDED $27,850 $94,614 $22,062
139,728
kWh
$2,269
-
kW-mo/yr
$1,953
-
MMBtu
$1,777 $(-211.0)
TOTAL IMPLEMENTED $14,941 $82,246 $11,463
72,601
kWh
$1,912
-
kW-mo/yr
- $1,777 $(-211.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs