Assessment Year | 2018 |
---|---|
Principal Product | Treated Wastewater |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $50 M to 100M |
# of Employees | 235 |
Plant Area |
1,203,520
ft2
|
Annual Production | 6,935,000
units
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $781,420 | 17,442,403 |
kWh
|
$0.045 |
Electricity Demand | $199,512 | 23,894 |
kW-mo/yr
|
$8.35 |
Electricity Fees | $242,219 | - |
|
- |
TOTAL YEARLY COSTS | $1,223,151 | |||
RECOMMENDED SAVINGS* | $1,162,732 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 3.3128: Utilize other methods to remove contaminants | $1,082,323 | $800,001 |
$(-104,185.0)
(-1,774,868)
kWh
|
$(-14,127.0)
-
kW-mo/yr
|
$1,200,635
-
MMBtu
|
|
02 | 2.2444: Use hot process fluids to preheat incoming process fluids | $68,286 | $68,224 | - | - |
$68,286
-
MMBtu
|
|
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,749 | $10,303 |
$2,301
39,195
kWh
|
$448
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,277 | $1,904 |
$1,069
18,212
kWh
|
$208
-
kW-mo/yr
|
- | |
05 | 2.4322: Use or replace with energy efficient substitutes | $8,097 | $30,240 |
$6,054
103,142
kWh
|
$2,043
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $1,162,732 | $910,672 |
$(-94,761.0)
(-1,614,319)
kWh
|
$(-11,428.0)
-
kW-mo/yr
|
$1,268,921
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs