ITAC Assessment: OR0711
ITAC logo
ITAC Assessment: OR0711
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $50
M
to 100
M
# of Employees 235
Plant Area 1,203,520
ft2
Annual Production 6,935,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $781,420 17,442,403
kWh
Electricity Demand $199,512 23,894
kW-mo/yr
Electricity Fees $242,219 -
TOTAL YEARLY COSTS $1,223,151
RECOMMENDED SAVINGS* $1,162,732 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 3.3128: Utilize other methods to remove contaminants $1,082,323 $800,001 $(-104,185.0)
(-1,774,868)
kWh
$(-14,127.0)
-
kW-mo/yr
$1,200,635
-
MMBtu
02 2.2444: Use hot process fluids to preheat incoming process fluids $68,286 $68,224 - - $68,286
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,749 $10,303 $2,301
39,195
kWh
$448
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,277 $1,904 $1,069
18,212
kWh
$208
-
kW-mo/yr
-
05 2.4322: Use or replace with energy efficient substitutes $8,097 $30,240 $6,054
103,142
kWh
$2,043
-
kW-mo/yr
-
TOTAL RECOMMENDED $1,162,732 $910,672 $(-94,761.0)
(-1,614,319)
kWh
$(-11,428.0)
-
kW-mo/yr
$1,268,921
-
MMBtu
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs