ITAC Assessment: SF0464
ITAC logo
ITAC Assessment: SF0464
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Goat Cheese
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 24,000
ft2
Annual Production 1,000,000
lb
Production Hrs. Annual 3,822
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,533 752,887
kWh
Electricity Demand $52,673 2,089
kW-mo/yr
Electricity Fees $5,150 -
Natural Gas $36,962 3,783
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,100 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,100

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.1113: Reduce combustion air flow to optimum $884 - - - $2,084
-
MMBtu
$(-1,200.0)
02 2.7111: Reduce illumination to minimum necessary levels $8,004 $2,118 $5,171
45,433
kWh
$2,833
-
kW-mo/yr
- -
03 2.7131: Add area lighting switches $6,212 $2,837 $4,016
35,287
kWh
$2,196
-
kW-mo/yr
- -
TOTAL RECOMMENDED $15,100 $4,955 $9,187
80,720
kWh
$5,029
-
kW-mo/yr
$2,084
-
MMBtu
$(-1,200.0)
TOTAL IMPLEMENTED $15,100 $4,955 $9,187
80,720
kWh
$5,029
-
kW-mo/yr
$2,084
-
MMBtu
$(-1,200.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs