| Assessment Year | 2014 |
|---|---|
| Principal Product | Speciality Chemicals |
| NAICS | 325998: All Other Miscellaneous Chemical Product and Preparation Manufacturing |
| SIC | 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 123 |
| Plant Area |
136,551
ft2
|
| Annual Production | 40,000,000
lb
|
| Production Hrs. Annual | 2,210
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $80,320 | 752,799 |
kWh
|
$0.11 |
| Electricity Demand | $54,463 | 4,812 |
kW-mo/yr
|
$11.32 |
| Natural Gas | $6,914 | 747 |
MMBtu
|
$9.26 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $116,445 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $10,880 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,158 | $180 |
$1,011
9,475
kWh
|
$147
-
kW-mo/yr
|
- | - | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,323 | - | - |
$2,323
-
kW-mo/yr
|
- | - | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $10,640 | $4,356 | - |
$10,640
-
kW-mo/yr
|
- | - | |
| 04 | 2.7135: Install occupancy sensors | $4,973 | $3,386 |
$3,194
29,940
kWh
|
$1,779
-
kW-mo/yr
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $487 | $898 |
$339
3,175
kWh
|
$148
-
kW-mo/yr
|
- | - | |
| 06 | 2.6211: Conserve energy by efficient use of vending machines | $270 | $597 |
$270
2,529
kWh
|
- | - | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,420 | $21,352 |
$4,636
43,452
kWh
|
$489
-
kW-mo/yr
|
$223 | $72 | |
| 08 | 2.9114: Use solar heat to make electricty | $91,174 | $463,974 |
$79,615
746,230
kWh
|
$11,559
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $116,445 | $494,743 |
$89,065
834,801
kWh
|
$27,085
-
kW-mo/yr
|
$223 | $72 | ||
| TOTAL IMPLEMENTED | $10,880 | $25,636 |
$8,169
76,567
kWh
|
$2,416
-
kW-mo/yr
|
$223 | $72 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Primary Raw Material Savings | |||