Assessment Year | 2014 |
---|---|
Principal Product | Almonds |
NAICS | 311911: Roasted Nuts and Peanut Butter Manufacturing |
SIC | 2068: Salted and Roasted Nuts and Seeds |
Sales Range | greater than $500 M |
# of Employees | 600 |
Plant Area |
1,400,000
ft2
|
Annual Production | 2,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,518,516 | 25,963,122 |
kWh
|
$0.097 |
Electricity Demand | $162,669 | 57,684 |
kW-mo/yr
|
$2.82 |
Natural Gas | $1,011,593 | 174,747 |
MMBtu
|
$5.79 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $506,549 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $506,549 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $26,214 | $210 |
$25,499
262,869
kWh
|
$715
-
kW-mo/yr
|
- | - | - | - | - | |
02 | 2.7224: Reduce space conditioning during non-working hours | $94,396 | - |
$63,497
654,586
kWh
|
- |
$30,899
-
MMBtu
|
- | - | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $638 | $280 |
$604
6,334
kWh
|
$34
-
kW-mo/yr
|
- | - | - | - | - | |
04 | 2.1243: Use heat from boiler blowdown to preheat boiler feed water | $14,213 | $10,295 | - | - |
$9,118
-
MMBtu
|
- | - | - |
$5,095
-
Tgal
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $232,437 | $204,574 |
$232,437
2,396,155
kWh
|
- | - | - | - | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,943 | $11,569 |
$12,943
133,431
kWh
|
- | - | - | - | - | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,151 | $3,742 |
$4,151
42,795
kWh
|
- | - | - | - | - | - | |
08 | 2.2696: Use excess cold process fluid for industrial cooling needs | $13,254 | $19,582 |
$12,746
131,400
kWh
|
$508
-
kW-mo/yr
|
- | - | - | - | - | |
09 | 2.4322: Use or replace with energy efficient substitutes | $13,364 | $21,937 |
$13,364
137,763
kWh
|
- | - | - | - | - | - | |
10 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,651 | $2,966 |
$1,590
15,764
kWh
|
$61
-
kW-mo/yr
|
- | - | - | - | - | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $40,078 | $103,067 |
$38,485
396,741
kWh
|
$1,426
-
kW-mo/yr
|
- | - | $1,614 | $(-1,447.0) | - | |
12 | 2.2128: Use steam condensate for hot water supply (non-potable) | $43,986 | $154,938 | - | - |
$22,623
-
MMBtu
|
$3,880
-
Tgal
|
- | - |
$17,483
-
Tgal
|
|
13 | 2.7135: Install occupancy sensors | $5,163 | $31,786 |
$4,813
49,614
kWh
|
$350
-
kW-mo/yr
|
- | - | - | - | - | |
14 | 2.3132: Recharge batteries on during off-peak demand periods | $4,061 | $12,152 | - |
$4,061
-
kW-mo/yr
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $506,549 | $577,098 |
$410,129
4,227,452
kWh
|
$7,155
-
kW-mo/yr
|
$62,640
-
MMBtu
|
$3,880
-
Tgal
|
$1,614 | $(-1,447.0) |
$22,578
-
Tgal
|
||
TOTAL IMPLEMENTED | $506,549 | $577,098 |
$410,129
4,227,452
kWh
|
$7,155
-
kW-mo/yr
|
$62,640
-
MMBtu
|
$3,880
-
Tgal
|
$1,614 | $(-1,447.0) |
$22,578
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Primary Raw Material Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs