ITAC Assessment: SF0455
ITAC logo
ITAC Assessment: SF0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Almonds
NAICS 311911: Roasted Nuts and Peanut Butter Manufacturing
SIC 2068: Salted and Roasted Nuts and Seeds
Sales Range greater than $500
M
# of Employees 600
Plant Area 1,400,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,518,516 25,963,122
kWh
Electricity Demand $162,669 57,684
kW-mo/yr
Natural Gas $1,011,593 174,747
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $506,549 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $506,549

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $26,214 $210 $25,499
262,869
kWh
$715
-
kW-mo/yr
- - - - -
02 2.7224: Reduce space conditioning during non-working hours $94,396 - $63,497
654,586
kWh
- $30,899
-
MMBtu
- - - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $638 $280 $604
6,334
kWh
$34
-
kW-mo/yr
- - - - -
04 2.1243: Use heat from boiler blowdown to preheat boiler feed water $14,213 $10,295 - - $9,118
-
MMBtu
- - - $5,095
-
Tgal
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $232,437 $204,574 $232,437
2,396,155
kWh
- - - - - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,943 $11,569 $12,943
133,431
kWh
- - - - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,151 $3,742 $4,151
42,795
kWh
- - - - - -
08 2.2696: Use excess cold process fluid for industrial cooling needs $13,254 $19,582 $12,746
131,400
kWh
$508
-
kW-mo/yr
- - - - -
09 2.4322: Use or replace with energy efficient substitutes $13,364 $21,937 $13,364
137,763
kWh
- - - - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,651 $2,966 $1,590
15,764
kWh
$61
-
kW-mo/yr
- - - - -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $40,078 $103,067 $38,485
396,741
kWh
$1,426
-
kW-mo/yr
- - $1,614 $(-1,447.0) -
12 2.2128: Use steam condensate for hot water supply (non-potable) $43,986 $154,938 - - $22,623
-
MMBtu
$3,880
-
Tgal
- - $17,483
-
Tgal
13 2.7135: Install occupancy sensors $5,163 $31,786 $4,813
49,614
kWh
$350
-
kW-mo/yr
- - - - -
14 2.3132: Recharge batteries on during off-peak demand periods $4,061 $12,152 - $4,061
-
kW-mo/yr
- - - - -
TOTAL RECOMMENDED $506,549 $577,098 $410,129
4,227,452
kWh
$7,155
-
kW-mo/yr
$62,640
-
MMBtu
$3,880
-
Tgal
$1,614 $(-1,447.0) $22,578
-
Tgal
TOTAL IMPLEMENTED $506,549 $577,098 $410,129
4,227,452
kWh
$7,155
-
kW-mo/yr
$62,640
-
MMBtu
$3,880
-
Tgal
$1,614 $(-1,447.0) $22,578
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Personnel Changes Savings Primary Raw Material Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs