ITAC Assessment: SF0436
ITAC logo
ITAC Assessment: SF0436
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product electroplating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $1
M
to 5
M
# of Employees 11
Plant Area 17,600
ft2
Annual Production 3,500
pieces
Production Hrs. Annual 3,504
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,457 268,207
kWh
Electricity Demand $9,339 1,027
kW-mo/yr
Natural Gas $2,504 246
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,987 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $438

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2514: Cover open tanks $6,314 $150 $6,058
48,583
kWh
$256
-
kW-mo/yr
- -
02 2.7224: Reduce space conditioning during non-working hours $438 - $315
2,525
kWh
- - $123
-
MMBtu
03 2.4224: Upgrade controls on compressors $2,488 $3,272 $2,488
19,953
kWh
- - -
04 2.7135: Install occupancy sensors $864 $2,751 $657
5,266
kWh
$207
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,275 $12,405 $2,271
18,212
kWh
$389
-
kW-mo/yr
$615 -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $608 $2,400 $744
5,967
kWh
$123
-
kW-mo/yr
- $(-259.0)
-
MMBtu
TOTAL RECOMMENDED $13,987 $20,978 $12,533
100,506
kWh
$975
-
kW-mo/yr
$615 $(-136.0)
-
MMBtu
TOTAL IMPLEMENTED $438 - $315
2,525
kWh
- - $123
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs