Assessment Year | 2013 |
---|---|
Principal Product | Treated Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 58 |
Plant Area |
900,000
ft2
|
Annual Production | 2,555,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $449,568 | 5,548,874 |
kWh
|
$0.081 |
Electricity Demand | $177,468 | 10,067 |
kW-mo/yr
|
$17.63 |
Electricity Fees | $18,037 | - |
|
- |
Natural Gas | $18,768 | 2,123 |
MMBtu
|
$8.84 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $120,709 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,478 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7224: Reduce space conditioning during non-working hours | $3,402 | - |
$3,402
41,242
kWh
|
- | - | |
02 | 2.4131: Size electric motors for peak operating efficiency | $35,740 | $12,095 |
$27,372
331,786
kWh
|
$8,368
-
kW-mo/yr
|
- | |
03 | 2.6218: Turn off equipment when not in use | $24,335 | $6,137 |
$24,335
294,965
kWh
|
- | - | |
04 | 2.6232: Install set-back timers | $535 | $210 |
$535
6,482
kWh
|
- | - | |
05 | 2.7131: Add area lighting switches | $10,130 | $19,788 |
$6,704
81,258
kWh
|
$3,426
-
kW-mo/yr
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $25,348 | $83,669 |
$21,879
265,195
kWh
|
$3,469
-
kW-mo/yr
|
- | |
07 | 2.7232: Replace existing hvac unit with high efficiency model | $1,616 | $9,150 |
$1,071
12,985
kWh
|
$955
-
kW-mo/yr
|
$(-410.0)
-
MMBtu
|
|
08 | 2.4322: Use or replace with energy efficient substitutes | $19,603 | $121,742 |
$15,013
181,972
kWh
|
$4,590
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $120,709 | $252,791 |
$100,311
1,215,885
kWh
|
$20,808
-
kW-mo/yr
|
$(-410.0)
-
MMBtu
|
||
TOTAL IMPLEMENTED | $35,478 | $103,457 |
$28,583
346,453
kWh
|
$6,895
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs