ITAC Assessment: SF0445
ITAC logo
ITAC Assessment: SF0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Waste Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 41
Plant Area 210,000
ft2
Annual Production 3,988,400
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,199 2,931,323
kWh
Electricity Demand $165,051 8,102
kW-mo/yr
Natural Gas $70,230 16,855
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,710 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $18,802

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,564 - $6,252
82,849
kWh
$2,312
-
kW-mo/yr
02 2.6218: Turn off equipment when not in use $2,245 - $2,245
29,747
kWh
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $30,086 $16,174 $21,964
291,069
kWh
$8,122
-
kW-mo/yr
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,993 $21,342 $5,835
77,325
kWh
$2,158
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $11,822 $90,352 $8,475
112,315
kWh
$3,347
-
kW-mo/yr
TOTAL RECOMMENDED $60,710 $127,868 $44,771
593,305
kWh
$15,939
-
kW-mo/yr
TOTAL IMPLEMENTED $18,802 $21,342 $14,332
189,921
kWh
$4,470
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs