ITAC Assessment: SF0430
ITAC logo
ITAC Assessment: SF0430
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Energy Recovery Devices for Water Desalination
NAICS 333911: Pump and Pumping Equipment Manufacturing
SIC 3559: Special Industry Machinery, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 177,000
ft2
Annual Production 1,700
pieces
Production Hrs. Annual 4,845
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $229,451 2,425,794
kWh
Electricity Demand $123,996 7,937
kW-mo/yr
Natural Gas $98,458 13,448
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $49,334 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,405

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $4,421 - $530
5,927
kWh
- $3,891
-
MMBtu
02 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,697 $768 $1,697
18,987
kWh
- -
03 2.7111: Reduce illumination to minimum necessary levels $6,822 $885 $4,313
48,242
kWh
$2,509
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,465 $16,491 $18,100
202,456
kWh
$7,365
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $6,727 $9,958 $4,405
49,278
kWh
$2,322
-
kW-mo/yr
-
06 2.6231: Utilize controls to operate equipment only when needed $841 $2,072 $841
9,403
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,332 $4,481 $1,332
16,302
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,029 $5,603 $917
10,261
kWh
$1,112
-
kW-mo/yr
-
TOTAL RECOMMENDED $49,334 $40,258 $32,135
360,856
kWh
$13,308
-
kW-mo/yr
$3,891
-
MMBtu
TOTAL IMPLEMENTED $38,405 $18,144 $24,640
275,612
kWh
$9,874
-
kW-mo/yr
$3,891
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs