Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Cereal Varieties
NAICS 311230: Breakfast Cereal Manufacturing
SIC 2043: Cereal Breakfast Foods
Sales Range $10
M
to 50
M
# of Employees 145
Plant Area 1,100,000
ft2
Annual Production 54,000,000
lb
Production Hrs. Annual 5,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $792,750 13,637,718
kWh
Electricity Demand $422,745 33,972
kW-mo/yr
Natural Gas $584,431 143,286
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $121,479 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,811

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings
01 2.7224: Reduce space conditioning during non-working hours $7,313 - $7,313
124,799
kWh
- - - - -
02 2.7311: Ventilation system to shut off when room is not in use $5,121 - $3,968
67,711
kWh
$1,153
-
kW-mo/yr
- - - -
03 2.2121: Increase amount of condensate returned $13,990 $3,780 - - - $10,081
-
MMBtu
- $3,909
-
gal
04 2.4221: Install compressor air intakes in coolest locations $4,736 $1,751 $3,311
56,509
kWh
$1,425
-
kW-mo/yr
- - - -
05 2.2511: Insulate bare equipment $584 $329 - - - $584
-
MMBtu
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $26,782 $19,063 $16,877
288,000
kWh
$14,916
-
kW-mo/yr
- $(-5,011.0)
-
MMBtu
- -
07 2.2511: Insulate bare equipment $1,669 $1,332 - - - - $1,669
-
MMBtu
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $542 $421 $343
5,853
kWh
$199
-
kW-mo/yr
- - - -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,709 $11,701 $12,709
216,884
kWh
- - - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,972 $12,679 $10,988
187,511
kWh
$984
-
kW-mo/yr
- - - -
11 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,652 $9,933 $7,700
131,399
kWh
$2,238
-
kW-mo/yr
- $(-2,286.0)
-
MMBtu
- -
12 2.7135: Install occupancy sensors $15,352 $26,883 $9,851
168,100
kWh
$5,501
-
kW-mo/yr
- - - -
13 2.2522: Isolate hot or cold equipment $2,222 $6,975 - - - $2,222
-
MMBtu
- -
14 2.1311: Replace electrically-operated equipment with fossil fuel equipment $5,775 $25,138 $6,134
104,681
kWh
$1,326
-
kW-mo/yr
- $(-1,685.0)
-
MMBtu
- -
15 2.7142: Utilize higher efficiency lamps and/or ballasts $5,060 $57,544 $3,697
63,081
kWh
$1,047
-
kW-mo/yr
$316 - - -
TOTAL RECOMMENDED $121,479 $177,529 $82,891
1,414,528
kWh
$28,789
-
kW-mo/yr
$316 $3,905
-
MMBtu
$1,669
-
MMBtu
$3,909
-
gal
TOTAL IMPLEMENTED $30,811 $15,762 $25,580
436,530
kWh
$3,562
-
kW-mo/yr
- - $1,669
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings LPG Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs