| Assessment Year | 2024 |
|---|---|
| Principal Product | Labels |
| NAICS | 323111: Commercial Printing (except Screen and Books) |
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 108 |
| Plant Area |
70,000
ft2
|
| Annual Production | 45,830,677
units
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Tennessee |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $212,399 | 2,893,000 |
kWh
|
$0.073 | |
| Electricity Demand | $95,018 | 7,616 |
kW-mo/yr
|
$12.48 | |
| Natural Gas | $6,321 | 528 |
MMBtu
|
$11.97 | |
| Waste Disposal Costs | |||||
| Water Disposal | $6,842 | 533 |
Tgal
|
$12.84 | |
| TOTAL YEARLY COSTS | $320,580 | ||||
| RECOMMENDED SAVINGS* | $217,058 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,676 | $225 |
$1,676
22,838
kWh
|
- | |
| 02 | 2.7314: Reduce ventilation air | $5,884 | $240 |
$5,884
80,158
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,566 | $1,450 |
$1,566
21,332
kWh
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,477 | $3,890 |
$2,621
35,705
kWh
|
$857
-
kW-mo/yr
|
|
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $176,493 | $288,000 |
$138,710
1,889,780
kWh
|
$37,783
-
kW-mo/yr
|
|
| 06 | 2.9113: Use solar heat for heat | $27,962 | $102,465 |
$27,962
380,963
kWh
|
- | |
| TOTAL RECOMMENDED | $217,058 | $396,270 |
$178,418
2,430,777
kWh
|
$38,640
-
kW-mo/yr
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs