ITAC Assessment: TT0307
ITAC logo
ITAC Assessment: TT0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Labels
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 108
Plant Area 70,000
ft2
Annual Production 45,830,677
units
Production Hrs. Annual 6,240
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $212,399 2,893,000
kWh
Electricity Demand $95,018 7,616
kW-mo/yr
Natural Gas $6,321 528
MMBtu
Waste Disposal Costs
Water Disposal $6,842 533
Tgal
TOTAL YEARLY COSTS $320,580
RECOMMENDED SAVINGS* $217,058 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $1,676 $225 $1,676
22,838
kWh
-
02 2.7314: Reduce ventilation air $5,884 $240 $5,884
80,158
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,566 $1,450 $1,566
21,332
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,477 $3,890 $2,621
35,705
kWh
$857
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $176,493 $288,000 $138,710
1,889,780
kWh
$37,783
-
kW-mo/yr
06 2.9113: Use solar heat for heat $27,962 $102,465 $27,962
380,963
kWh
-
TOTAL RECOMMENDED $217,058 $396,270 $178,418
2,430,777
kWh
$38,640
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs