ITAC Assessment: MS0324
ITAC logo
ITAC Assessment: MS0324
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Fiberglass Boats
NAICS 336612: Boat Building
SIC 3732: Boat Building and Repairing
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 140,000
ft2
Annual Production 1,200
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $84,874 1,168,920
kWh
Electricity Demand $23,891 4,790
kW-mo/yr
Electricity Fees $3,413 -
Natural Gas $55,055 4,877
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,677 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,982

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,347 $19,752 $2,337
53,573
kWh
$3,916
-
kW-mo/yr
$94
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,635 $343 $2,596
59,494
kWh
- $39
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,259 $7,070 $460
10,537
kWh
$781
-
kW-mo/yr
$18
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $436 $363 $154
3,352
kWh
$281
-
kW-mo/yr
$1
TOTAL RECOMMENDED $10,677 $27,528 $5,547
126,956
kWh
$4,978
-
kW-mo/yr
$152
TOTAL IMPLEMENTED $8,982 $20,095 $4,933
113,067
kWh
$3,916
-
kW-mo/yr
$133
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs