Assessment Year | 2013 |
---|---|
Principal Product | Lab Test Data |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2835: In Vitro and In Vivo Diagnostic Substances |
Sales Range | $50 M to 100M |
# of Employees | 220 |
Plant Area |
75,000
ft2
|
Annual Production | 84,000
units
|
Production Hrs. Annual | 6,552
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $478,177 | 4,540,150 |
kWh
|
$0.11 |
Electricity Demand | $135,941 | 11,224 |
kW-mo/yr
|
$12.11 |
Electricity Fees | $7,745 | - |
|
- |
Natural Gas | $148,037 | 20,865 |
MMBtu
|
$7.09 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $21,768 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7144: Install spectral reflectors / delamp | $2,240 | $396 |
$1,632
15,541
kWh
|
$608
-
kW-mo/yr
|
- | |
02 | 2.2123: Insulate feedwater tank | $445 | $195 | - | - |
$445
-
MMBtu
|
|
03 | 2.2162: Reduce excess steam bleeding | $1,742 | $1,330 | - | - |
$1,742
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,094 | $4,350 |
$2,094
19,946
kWh
|
- | - | |
05 | 2.4226: Use / purchase optimum sized compressor | $2,698 | $8,191 |
$2,698
25,697
kWh
|
- | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $1,704 | $5,524 |
$2,395
22,811
kWh
|
- |
$(-691.0)
-
MMBtu
|
|
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,106 | $17,609 |
$5,106
48,624
kWh
|
- | - | |
08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,429 | $17,469 |
$3,466
33,010
kWh
|
$963
-
kW-mo/yr
|
- | |
09 | 2.7135: Install occupancy sensors | $1,310 | $8,199 |
$1,201
11,439
kWh
|
$109
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $21,768 | $63,263 |
$18,592
177,068
kWh
|
$1,680
-
kW-mo/yr
|
$1,496
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs