ITAC Assessment: SF0427
ITAC logo
ITAC Assessment: SF0427
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Lab Test Data
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $50
M
to 100
M
# of Employees 220
Plant Area 75,000
ft2
Annual Production 84,000
units
Production Hrs. Annual 6,552
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $478,177 4,540,150
kWh
Electricity Demand $135,941 11,224
kW-mo/yr
Electricity Fees $7,745 -
Natural Gas $148,037 20,865
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,768 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7144: Install spectral reflectors / delamp $2,240 $396 $1,632
15,541
kWh
$608
-
kW-mo/yr
-
02 2.2123: Insulate feedwater tank $445 $195 - - $445
-
MMBtu
03 2.2162: Reduce excess steam bleeding $1,742 $1,330 - - $1,742
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,094 $4,350 $2,094
19,946
kWh
- -
05 2.4226: Use / purchase optimum sized compressor $2,698 $8,191 $2,698
25,697
kWh
- -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,704 $5,524 $2,395
22,811
kWh
- $(-691.0)
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,106 $17,609 $5,106
48,624
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,429 $17,469 $3,466
33,010
kWh
$963
-
kW-mo/yr
-
09 2.7135: Install occupancy sensors $1,310 $8,199 $1,201
11,439
kWh
$109
-
kW-mo/yr
-
TOTAL RECOMMENDED $21,768 $63,263 $18,592
177,068
kWh
$1,680
-
kW-mo/yr
$1,496
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs