Assessment Year | 2012 |
---|---|
Principal Product | Cheese and Whey Products |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $50 M to 100M |
# of Employees | 60 |
Plant Area |
136,000
ft2
|
Annual Production | 70,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $223,510 | 2,618,175 |
kWh
|
$0.085 |
Electricity Demand | $235,883 | 9,550 |
kW-mo/yr
|
$24.70 |
Electricity Fees | $8,522 | - |
|
- |
Natural Gas | $557,137 | 99,803 |
MMBtu
|
$5.58 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,241 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,068 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $637 | $80 |
$383
4,507
kWh
|
$254
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,754 | $2,287 |
$2,754
32,405
kWh
|
- | - | |
03 | 2.2624: Use cold waste water to cool chiller feed water | $1,176 | $963 |
$1,176
13,839
kWh
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,431 | $16,162 |
$7,431
87,425
kWh
|
- | - | |
05 | 4.443: Install automatic boiler fuel feed system | $8,615 | $42,287 |
$3,732
43,908
kWh
|
$1,483
-
kW-mo/yr
|
$3,400
-
MMBtu
|
|
06 | 2.2447: Heat water with exhaust heat | $5,628 | $35,328 | - | - |
$5,628
-
MMBtu
|
|
TOTAL RECOMMENDED | $26,241 | $97,107 |
$15,476
182,084
kWh
|
$1,737
-
kW-mo/yr
|
$9,028
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,068 | $16,242 |
$7,814
91,932
kWh
|
$254
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs