ITAC Assessment: SF0419
ITAC logo
ITAC Assessment: SF0419
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Cheese and Whey Products
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 60
Plant Area 136,000
ft2
Annual Production 70,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $223,510 2,618,175
kWh
Electricity Demand $235,883 9,550
kW-mo/yr
Electricity Fees $8,522 -
Natural Gas $557,137 99,803
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,241 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,068

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $637 $80 $383
4,507
kWh
$254
-
kW-mo/yr
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,754 $2,287 $2,754
32,405
kWh
- -
03 2.2624: Use cold waste water to cool chiller feed water $1,176 $963 $1,176
13,839
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $7,431 $16,162 $7,431
87,425
kWh
- -
05 4.443: Install automatic boiler fuel feed system $8,615 $42,287 $3,732
43,908
kWh
$1,483
-
kW-mo/yr
$3,400
-
MMBtu
06 2.2447: Heat water with exhaust heat $5,628 $35,328 - - $5,628
-
MMBtu
TOTAL RECOMMENDED $26,241 $97,107 $15,476
182,084
kWh
$1,737
-
kW-mo/yr
$9,028
-
MMBtu
TOTAL IMPLEMENTED $8,068 $16,242 $7,814
91,932
kWh
$254
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs