Assessment Year | 2012 |
---|---|
Principal Product | Treated Sewage |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | less than $500 k |
# of Employees | 35 |
Plant Area |
620,000
ft2
|
Annual Production | 6,205,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,264,134 | 15,636,290 |
kWh
|
$0.081 |
Electricity Demand | $682,593 | 36,660 |
kW-mo/yr
|
$18.62 |
Electricity Fees | $30,062 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $294,337 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $131,728 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $6,448 | - |
$6,448
79,509
kWh
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $923 | - |
$923
27,684
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $915 | - |
$700
8,629
kWh
|
$215
-
kW-mo/yr
|
|
04 | 2.4322: Use or replace with energy efficient substitutes | $1,223 | $382 |
$589
7,266
kWh
|
$634
-
kW-mo/yr
|
|
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $25,314 | $38,630 |
$17,370
214,602
kWh
|
$7,944
-
kW-mo/yr
|
|
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $85,494 | $200,504 |
$65,162
804,416
kWh
|
$20,332
-
kW-mo/yr
|
|
07 | 2.7135: Install occupancy sensors | $39,049 | $165,422 |
$29,759
367,372
kWh
|
$9,290
-
kW-mo/yr
|
|
08 | 2.4226: Use / purchase optimum sized compressor | $5,081 | $36,975 |
$3,901
48,105
kWh
|
$1,180
-
kW-mo/yr
|
|
09 | 2.4322: Use or replace with energy efficient substitutes | $129,890 | $2,875,288 |
$99,737
1,229,804
kWh
|
$30,153
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $294,337 | $3,317,201 |
$224,589
2,787,387
kWh
|
$69,748
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $131,728 | $2,875,288 |
$101,360
1,266,117
kWh
|
$30,368
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs