Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Treated Sewage
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 35
Plant Area 620,000
ft2
Annual Production 6,205,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,264,134 15,636,290
kWh
Electricity Demand $682,593 36,660
kW-mo/yr
Electricity Fees $30,062 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $294,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $131,728

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6218: Turn off equipment when not in use $6,448 - $6,448
79,509
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $923 - $923
27,684
kWh
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $915 - $700
8,629
kWh
$215
-
kW-mo/yr
04 2.4322: Use or replace with energy efficient substitutes $1,223 $382 $589
7,266
kWh
$634
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,314 $38,630 $17,370
214,602
kWh
$7,944
-
kW-mo/yr
06 2.7142: Utilize higher efficiency lamps and/or ballasts $85,494 $200,504 $65,162
804,416
kWh
$20,332
-
kW-mo/yr
07 2.7135: Install occupancy sensors $39,049 $165,422 $29,759
367,372
kWh
$9,290
-
kW-mo/yr
08 2.4226: Use / purchase optimum sized compressor $5,081 $36,975 $3,901
48,105
kWh
$1,180
-
kW-mo/yr
09 2.4322: Use or replace with energy efficient substitutes $129,890 $2,875,288 $99,737
1,229,804
kWh
$30,153
-
kW-mo/yr
TOTAL RECOMMENDED $294,337 $3,317,201 $224,589
2,787,387
kWh
$69,748
-
kW-mo/yr
TOTAL IMPLEMENTED $131,728 $2,875,288 $101,360
1,266,117
kWh
$30,368
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs