| Assessment Year | 2012 |
|---|---|
| Principal Product | Bread and Other Bakery ProductsC |
| NAICS | 311812: Commercial Bakeries |
| SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
100,000
ft2
|
| Annual Production | 40,000,000
lb
|
| Production Hrs. Annual | 4,420
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $347,823 | 3,883,488 |
kWh
|
$0.090 |
| Electricity Demand | $150,808 | 9,720 |
kW-mo/yr
|
$15.52 |
| Electricity Fees | $33,009 | - |
|
- |
| Natural Gas | $197,945 | 34,605 |
MMBtu
|
$5.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,438 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2135: Repair and eliminate steam leaks | $315 | - | - | - |
$315
-
MMBtu
|
|
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,954 | - |
$1,954
32,739
kWh
|
- | - | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $5,535 | $314 |
$176
2,194
kWh
|
- |
$5,359
-
MMBtu
|
|
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $806 | $275 |
$508
6,328
kWh
|
$298
-
kW-mo/yr
|
- | |
| 05 | 2.6231: Utilize controls to operate equipment only when needed | $3,374 | $8,843 |
$3,374
42,074
kWh
|
- | - | |
| 06 | 2.2511: Insulate bare equipment | $798 | $2,121 | - | - |
$798
-
MMBtu
|
|
| 07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $4,656 | $19,110 |
$4,656
58,057
kWh
|
- | - | |
| TOTAL RECOMMENDED | $17,438 | $30,663 |
$10,668
141,392
kWh
|
$298
-
kW-mo/yr
|
$6,472
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs