Assessment Year | 2012 |
---|---|
Principal Product | Treated Water |
NAICS | 221320: Sewage Treatment Facilities |
SIC | 4952: Sewerage Systems |
Sales Range | $500 k to 1M |
# of Employees | 97 |
Plant Area |
962,000
ft2
|
Annual Production | 61,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Hawaii |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $7,991,830 | 34,259,440 |
kWh
|
$0.23 |
Electricity Demand | $1,534,377 | 79,656 |
kW-mo/yr
|
$19.26 |
Fuel Oil #2 | $382,102 | 20,732 |
MMBtu
|
$18.43 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,412,441 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,412,441 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1336: Install equipment to utilize waste fuel | $382,102 | $32,168 | - | - | - |
$382,102
-
MMBtu
|
|
02 | 2.7224: Reduce space conditioning during non-working hours | $53,342 | $534 |
$53,342
228,838
kWh
|
- | - | - | |
03 | 2.4322: Use or replace with energy efficient substitutes | $18,006 | $307 |
$16,165
69,379
kWh
|
$1,841
-
kW-mo/yr
|
- | - | |
04 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $66,394 | $56,875 |
$61,197
262,534
kWh
|
$5,197
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $139,165 | $143,802 |
$108,215
454,583
kWh
|
$9,960
-
kW-mo/yr
|
$20,990 | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $35,102 | $45,593 |
$32,723
140,443
kWh
|
- | $2,379 | - | |
07 | 2.4131: Size electric motors for peak operating efficiency | $22,348 | $35,892 |
$21,086
87,133
kWh
|
$1,262
-
kW-mo/yr
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $17,464 | $40,690 |
$13,726
58,885
kWh
|
$1,675
-
kW-mo/yr
|
$2,063 | - | |
09 | 2.7135: Install occupancy sensors | $74,747 | $202,884 |
$68,719
292,726
kWh
|
$6,028
-
kW-mo/yr
|
- | - | |
10 | 2.4145: Install isolation transformer on adjustable frequency drive | $14,800 | $59,457 |
$14,800
63,493
kWh
|
- | - | - | |
11 | 2.4224: Upgrade controls on compressors | $8,052 | $35,258 |
$7,595
31,385
kWh
|
$457
-
kW-mo/yr
|
- | - | |
12 | 2.7135: Install occupancy sensors | $3,894 | $18,292 |
$3,387
14,531
kWh
|
$507
-
kW-mo/yr
|
- | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,577,025 | $18,992,318 |
$2,313,647
9,925,556
kWh
|
$263,378
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $3,412,441 | $19,664,070 |
$2,714,602
11,629,486
kWh
|
$290,305
-
kW-mo/yr
|
$25,432 |
$382,102
-
MMBtu
|
||
TOTAL IMPLEMENTED | $3,412,441 | $19,664,070 |
$2,714,602
11,629,486
kWh
|
$290,305
-
kW-mo/yr
|
$25,432 |
$382,102
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Fuel Oil #2 Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs