ITAC Assessment: SF0409
ITAC logo
ITAC Assessment: SF0409
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Treated Water
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $500
k
to 1
M
# of Employees 97
Plant Area 962,000
ft2
Annual Production 61,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Hawaii

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $7,991,830 34,259,440
kWh
Electricity Demand $1,534,377 79,656
kW-mo/yr
Fuel Oil #2 $382,102 20,732
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,412,441 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,412,441

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings
01 2.1336: Install equipment to utilize waste fuel $382,102 $32,168 - - - $382,102
-
MMBtu
02 2.7224: Reduce space conditioning during non-working hours $53,342 $534 $53,342
228,838
kWh
- - -
03 2.4322: Use or replace with energy efficient substitutes $18,006 $307 $16,165
69,379
kWh
$1,841
-
kW-mo/yr
- -
04 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary $66,394 $56,875 $61,197
262,534
kWh
$5,197
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $139,165 $143,802 $108,215
454,583
kWh
$9,960
-
kW-mo/yr
$20,990 -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $35,102 $45,593 $32,723
140,443
kWh
- $2,379 -
07 2.4131: Size electric motors for peak operating efficiency $22,348 $35,892 $21,086
87,133
kWh
$1,262
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $17,464 $40,690 $13,726
58,885
kWh
$1,675
-
kW-mo/yr
$2,063 -
09 2.7135: Install occupancy sensors $74,747 $202,884 $68,719
292,726
kWh
$6,028
-
kW-mo/yr
- -
10 2.4145: Install isolation transformer on adjustable frequency drive $14,800 $59,457 $14,800
63,493
kWh
- - -
11 2.4224: Upgrade controls on compressors $8,052 $35,258 $7,595
31,385
kWh
$457
-
kW-mo/yr
- -
12 2.7135: Install occupancy sensors $3,894 $18,292 $3,387
14,531
kWh
$507
-
kW-mo/yr
- -
13 2.7142: Utilize higher efficiency lamps and/or ballasts $2,577,025 $18,992,318 $2,313,647
9,925,556
kWh
$263,378
-
kW-mo/yr
- -
TOTAL RECOMMENDED $3,412,441 $19,664,070 $2,714,602
11,629,486
kWh
$290,305
-
kW-mo/yr
$25,432 $382,102
-
MMBtu
TOTAL IMPLEMENTED $3,412,441 $19,664,070 $2,714,602
11,629,486
kWh
$290,305
-
kW-mo/yr
$25,432 $382,102
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs