ITAC Assessment: SF0407
ITAC logo
ITAC Assessment: SF0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Cheese and Whey Products
NAICS 311513: Cheese Manufacturing
SIC 2022: Natural, Processed, and Imitation Cheese
Sales Range $50
M
to 100
M
# of Employees 98
Plant Area 53,000
ft2
Annual Production 52,000,000
lb
Production Hrs. Annual 8,616
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $676,678 9,244,000
kWh
Electricity Demand $159,091 15,700
kW-mo/yr
Electricity Fees $15,161 -
Natural Gas $361,866 60,988
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $71,870 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,554

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $44,715 - $37,718
504,255
kWh
$6,997
-
kW-mo/yr
- - -
02 2.2135: Repair and eliminate steam leaks $7,965 $672 - - $7,965
-
MMBtu
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,152 $672 $5,152
68,876
kWh
- - - -
04 2.7224: Reduce space conditioning during non-working hours $3,004 - $640
8,559
kWh
- $2,364
-
MMBtu
- -
05 2.7292: Lower ceiling to reduce conditioned space $1,231 $630 $1,231
16,454
kWh
- - - -
06 2.2136: Install / repair insulation on steam lines $1,437 $1,299 - - $1,437
-
MMBtu
- -
07 2.7132: Install timers on light switches in little used areas $326 $312 $283
3,796
kWh
$43
-
kW-mo/yr
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $8,040 $28,647 $4,548
60,808
kWh
$704
-
kW-mo/yr
- $1,506 $1,282
TOTAL RECOMMENDED $71,870 $32,232 $49,572
662,748
kWh
$7,744
-
kW-mo/yr
$11,766
-
MMBtu
$1,506 $1,282
TOTAL IMPLEMENTED $14,554 $2,643 $5,152
68,876
kWh
- $9,402
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs