ITAC Assessment: SF0401
ITAC logo
ITAC Assessment: SF0401
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Decorative Trim Moldings
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 24
Plant Area 57,000
ft2
Annual Production 3,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,180 3,067,724
kWh
Electricity Demand $140,267 10,320
kW-mo/yr
Electricity Fees $30,626 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,327 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,461 - $1,461
15,764
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,739 $5,292 $12,739
104,738
kWh
-
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,247 $790 $3,247
35,024
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,009 $11,288 $16,009
131,637
kWh
-
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,392 $2,205 $2,392
25,808
kWh
-
06 2.7135: Install occupancy sensors $443 $1,057 $443
3,270
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $6,415 $25,369 $4,858
52,410
kWh
$1,557
-
kW-mo/yr
08 2.4226: Use / purchase optimum sized compressor $11,621 $39,987 $11,621
114,150
kWh
-
TOTAL RECOMMENDED $54,327 $85,988 $52,770
482,801
kWh
$1,557
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs