Assessment Year | 2011 |
---|---|
Principal Product | Decorative Trim Moldings |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 24 |
Plant Area |
57,000
ft2
|
Annual Production | 3,000,000
lb
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $290,180 | 3,067,724 |
kWh
|
$0.095 |
Electricity Demand | $140,267 | 10,320 |
kW-mo/yr
|
$13.59 |
Electricity Fees | $30,626 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,327 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,461 | - |
$1,461
15,764
kWh
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $12,739 | $5,292 |
$12,739
104,738
kWh
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,247 | $790 |
$3,247
35,024
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $16,009 | $11,288 |
$16,009
131,637
kWh
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,392 | $2,205 |
$2,392
25,808
kWh
|
- | |
06 | 2.7135: Install occupancy sensors | $443 | $1,057 |
$443
3,270
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,415 | $25,369 |
$4,858
52,410
kWh
|
$1,557
-
kW-mo/yr
|
|
08 | 2.4226: Use / purchase optimum sized compressor | $11,621 | $39,987 |
$11,621
114,150
kWh
|
- | |
TOTAL RECOMMENDED | $54,327 | $85,988 |
$52,770
482,801
kWh
|
$1,557
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs