Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Liquid Milk
NAICS 311511: Fluid Milk Manufacturing
SIC 2026: Fluid Milk
Sales Range $10
M
to 50
M
# of Employees 385
Plant Area 41,000
ft2
Annual Production 22,000
Tgal
Production Hrs. Annual 8,112
hrs
Location (State) Hawaii

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,035,721 5,895,486
kWh
Electricity Demand $166,405 12,373
kW-mo/yr
Electricity Fees $26,736 -
Natural Gas $314,339 13,907
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $328,667 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $163,858

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,408 $720 $7,408
42,164
kWh
- -
02 2.2437: Recover waste heat from equipment $99,396 $33,822 - - $99,396
-
MMBtu
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,385 $4,330 $6,385
36,343
kWh
- -
04 2.7447: Install vinyl strip / high speed / air curtain doors $1,791 $1,329 $1,791
10,195
kWh
- -
05 2.2622: Replace existing chiller with high efficiency model $153,800 $220,659 $132,585
756,163
kWh
$21,215
-
kW-mo/yr
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,218 $19,157 $9,218
52,467
kWh
- -
07 2.1221: Replace obsolete burners with more efficient ones $32,171 $34,310 - - $32,171
-
MMBtu
08 2.2511: Insulate bare equipment $6,132 $17,178 - - $6,132
-
MMBtu
09 2.7142: Utilize higher efficiency lamps and/or ballasts $9,350 $25,921 $9,350
37,450
kWh
- -
10 2.7135: Install occupancy sensors $3,016 $14,478 $3,016
13,890
kWh
- -
TOTAL RECOMMENDED $328,667 $371,904 $169,753
948,672
kWh
$21,215
-
kW-mo/yr
$137,699
-
MMBtu
TOTAL IMPLEMENTED $163,858 $130,759 $26,159
129,847
kWh
- $137,699
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs