ITAC Assessment: SF0373
ITAC logo
ITAC Assessment: SF0373
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Labels for Wine and Spirits
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 94
Plant Area 60,000
ft2
Annual Production 1,400,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $289,131 3,386,198
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,310

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.2135: Repair and eliminate steam leaks $1,103 - $1,103
17,131
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $3,700 $3,605 $3,700
43,321
kWh
-
03 2.7135: Install occupancy sensors $1,227 $1,320 - $1,227
-
kW-mo/yr
04 2.4133: Use most efficient type of electric motors $335 $553 $335
3,926
kWh
-
05 2.4231: Reduce the pressure of compressed air to the minimum required $765 $1,569 $765
8,864
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $402 $906 $402
4,710
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,543 $12,880 $1,543
18,064
kWh
-
08 2.9114: Use solar heat to make electricty $32,866 $534,450 $32,866
384,800
kWh
-
TOTAL RECOMMENDED $41,941 $555,283 $40,714
480,816
kWh
$1,227
-
kW-mo/yr
TOTAL IMPLEMENTED $8,310 $19,264 $7,083
87,152
kWh
$1,227
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs