Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product molded plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 28
Plant Area 12,000
ft2
Annual Production 30,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $97,464 714,490
kWh
Electricity Demand $8,199 2,102
kW-mo/yr
Electricity Fees $12,612 -
Natural Gas $2,394 168
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $28,764 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $707 - $707
7,820
kWh
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,050 $12,551 $8,949
65,606
kWh
$101
-
kW-mo/yr
03 2.4133: Use most efficient type of electric motors $545 $789 $522
3,828
kWh
$23
-
kW-mo/yr
04 2.7135: Install occupancy sensors $765 $1,142 $738
5,393
kWh
$27
-
kW-mo/yr
05 2.4224: Upgrade controls on compressors $7,121 $20,369 $7,121
52,201
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $5,009 $17,634 $4,650
34,096
kWh
$359
-
kW-mo/yr
07 2.4321: Upgrade obsolete equipment $5,567 $24,469 $5,567
40,812
kWh
-
TOTAL RECOMMENDED $28,764 $76,954 $28,254
209,756
kWh
$510
-
kW-mo/yr
TOTAL IMPLEMENTED $707 - $707
7,820
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs