Assessment Year | 2009 |
---|---|
Principal Product | Bottled Wine |
NAICS | 312130: Wineries |
SIC | 2084: Wines, Brandy, and Brandy Spirits |
Sales Range | $100 M to 500M |
# of Employees | 100 |
Plant Area |
150,000
ft2
|
Annual Production | 1,600,000,000
pieces
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $242,425 | 2,950,115 |
kWh
|
$0.082 |
Electricity Demand | $145,062 | 17,941 |
kW-mo/yr
|
$8.09 |
Electricity Fees | $6,764 | - |
|
- |
Natural Gas | $111,727 | 9,669 |
MMBtu
|
$11.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $76,732 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $50,534 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $739 | $70 |
$470
5,503
kWh
|
$269
-
kW-mo/yr
|
- | |
02 | 2.2135: Repair and eliminate steam leaks | $565 | $60 |
$565
6,611
kWh
|
- | - | |
03 | 2.4224: Upgrade controls on compressors | $15,017 | $14,000 |
$15,017
175,726
kWh
|
- | - | |
04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $34,213 | $37,500 |
$34,213
400,343
kWh
|
- | - | |
05 | 2.2621: Modify refrigeration system to operate at a lower pressure | $16,866 | $26,548 |
$14,836
173,598
kWh
|
$2,030
-
kW-mo/yr
|
- | |
06 | 2.2444: Use hot process fluids to preheat incoming process fluids | $1,751 | $3,312 |
$734
34,385
kWh
|
- |
$1,017
-
MMBtu
|
|
07 | 2.4239: Eliminate or reduce compressed air usage | $328 | $1,039 |
$328
3,835
kWh
|
- | - | |
08 | 2.2691: Shut off cooling if cold outside air will cool process | $7,253 | $41,149 |
$7,253
84,866
kWh
|
- | - | |
TOTAL RECOMMENDED | $76,732 | $123,678 |
$73,416
884,867
kWh
|
$2,299
-
kW-mo/yr
|
$1,017
-
MMBtu
|
||
TOTAL IMPLEMENTED | $50,534 | $51,630 |
$50,265
588,183
kWh
|
$269
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs