ITAC Assessment: SF0363
ITAC logo
ITAC Assessment: SF0363
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Bottled Wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 66
Plant Area 125,000
ft2
Annual Production 1
units
Production Hrs. Annual 2,850
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,977 5,550
kWh
Electricity Demand $72,508 5,452
kW-mo/yr
Electricity Fees $6,525 -
Natural Gas $35,811 2,912
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,655 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,649

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2135: Repair and eliminate steam leaks $2,927 - $2,927
742
kWh
02 2.6231: Utilize controls to operate equipment only when needed $968 $1,145 $968
15,002
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,754 $3,506 $1,754
21,209
kWh
04 2.4322: Use or replace with energy efficient substitutes $6,525 $14,831 $6,525
67,133
kWh
05 2.2621: Modify refrigeration system to operate at a lower pressure $9,481 $69,656 $9,481
93,801
kWh
TOTAL RECOMMENDED $21,655 $89,138 $21,655
197,887
kWh
TOTAL IMPLEMENTED $5,649 $4,651 $5,649
36,953
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs