ITAC Assessment: SF0361
ITAC logo
ITAC Assessment: SF0361
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Corn Snacks
NAICS 311919: Other Snack Food Manufacturing
SIC 2096: Potato Chips, Corn Chips, and Similar Snacks
Sales Range less than $500
k
# of Employees 65
Plant Area 59,100
ft2
Annual Production 19,500,000
lb
Production Hrs. Annual 5,880
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $244,957 2,718,000
kWh
Electricity Demand $114,128 6,438
kW-mo/yr
Electricity Fees $4,852 -
Natural Gas $411,715 53,623
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $41,687 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,980

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $6,816 - $6,816
68,692
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $701 - $701
17,782
kWh
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $237 $162 $237
2,628
kWh
- -
04 2.6231: Utilize controls to operate equipment only when needed $1,199 $713 $1,199
13,316
kWh
- -
05 2.2511: Insulate bare equipment $1,614 $1,036 - - $1,614
-
MMBtu
06 2.2447: Heat water with exhaust heat $24,668 $16,423 - - $24,668
-
MMBtu
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,413 $4,592 $5,413
60,114
kWh
- -
08 2.4133: Use most efficient type of electric motors $1,039 $1,502 $736
8,170
kWh
$303
-
kW-mo/yr
-
TOTAL RECOMMENDED $41,687 $24,428 $15,102
170,702
kWh
$303
-
kW-mo/yr
$26,282
-
MMBtu
TOTAL IMPLEMENTED $15,980 $6,503 $14,366
162,532
kWh
- $1,614
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs