ITAC Assessment: SF0005
ITAC logo
ITAC Assessment: SF0005
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Custom Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 42
Plant Area 12,000
ft2
Annual Production 250
ton
Production Hrs. Annual 6,000
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $56,493 526,377
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,379 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,886

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2511: Insulate bare equipment $1,768 $2,956 $1,768
16,706
kWh
02 2.4133: Use most efficient type of electric motors $1,726 $2,075 $1,726
16,120
kWh
03 2.2511: Insulate bare equipment $1,271 $1,442 $1,271
12,016
kWh
04 2.7142: Utilize higher efficiency lamps and/or ballasts $815 $670 $815
7,620
kWh
05 2.7135: Install occupancy sensors $345 $400 $345
3,224
kWh
06 2.2511: Insulate bare equipment $260 $243 $260
2,345
kWh
07 2.6231: Utilize controls to operate equipment only when needed $194 $192 $194
1,758
kWh
TOTAL RECOMMENDED $6,379 $7,978 $6,379
59,789
kWh
TOTAL IMPLEMENTED $2,886 $3,145 $2,886
26,964
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs