ITAC Assessment: SF0336
ITAC logo
ITAC Assessment: SF0336
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Drugs of Abuse Test Kits
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2835: In Vitro and In Vivo Diagnostic Substances
Sales Range $50
M
to 100
M
# of Employees 270
Plant Area 110,000
ft2
Annual Production 45,000,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $419,309 4,532,100
kWh
Electricity Demand $128,641 9,396
kW-mo/yr
Natural Gas $83,604 7,044
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,471 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7224: Reduce space conditioning during non-working hours $16 - $16
180
kWh
-
02 2.7314: Reduce ventilation air $202 - $202
2
kWh
-
03 2.7241: Install outside air damper / economizer on hvac unit $882 $24,000 $882
882
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,827 $5,934 $8
94
kWh
$2,819
-
kW-mo/yr
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $22,164 $15,000 $10
109
kWh
$22,154
-
kW-mo/yr
06 2.8114: Change rate schedules or other changes in utility service $31 $29,700 $31
-
kWh
-
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $883 $4,374 $3
38
kWh
$880
-
kW-mo/yr
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $872 $2,849 $2
30
kWh
$870
-
kW-mo/yr
09 2.7142: Utilize higher efficiency lamps and/or ballasts $2 $7,040 $1
15,233
kWh
$1
-
kW-mo/yr
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $234 $557 $142
1
kWh
$92
-
kW-mo/yr
11 2.7111: Reduce illumination to minimum necessary levels $955 $2,480 $499
5
kWh
$456
-
kW-mo/yr
12 2.7142: Utilize higher efficiency lamps and/or ballasts $2,076 $16,625 $2
24
kWh
$2,074
-
kW-mo/yr
13 2.4222: Install adequate dryers on air lines to eliminate blowdown $327 $6,381 $95
10
kWh
$232
-
kW-mo/yr
TOTAL RECOMMENDED $31,471 $114,940 $1,893
16,608
kWh
$29,578
-
kW-mo/yr
TOTAL IMPLEMENTED $3,812 $33,083 $957
15,455
kWh
$2,855
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs