ITAC Assessment: AS0209
ITAC logo
ITAC Assessment: AS0209
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Business Forms
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 86,000
ft2
Annual Production 16,000
pieces
Production Hrs. Annual 5,125
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $100,414 1,654,455
kWh
Electricity Demand $12,055 4,352
kW-mo/yr
Electricity Fees $9,690 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,958 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,971

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,534 $120 $1,265
22,860
kWh
$269
-
kW-mo/yr
- - - -
02 2.7111: Reduce illumination to minimum necessary levels $1,863 $270 $1,257
22,860
kWh
$606
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $211 $825 $152
2,638
kWh
$59
-
kW-mo/yr
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $9,257 $19,096 $7,311
132,474
kWh
$1,946
-
kW-mo/yr
- - - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $117 $15 $104
2,052
kWh
$13
-
kW-mo/yr
- - - -
06 2.7261: Install timers and/or thermostats $2,829 $2,880 $2,829
51,290
kWh
- - - - -
07 2.4133: Use most efficient type of electric motors $337 $407 $265
4,689
kWh
$72
-
kW-mo/yr
- - - -
08 2.7226: Use computer programs to optimize hvac performance $1,706 $5,327 - $1,706
-
kW-mo/yr
- - - -
09 3.3133: Use other waste concentration methods $8,329 $14,000 $(-11.0)
293
kWh
- $8,880
-
gal
$(-180.0) - $(-360.0)
10 3.6192: Use a less expensive method of waste removal $1,750 $30 - - - - $1,750 -
11 2.8114: Change rate schedules or other changes in utility service $3,025 $30 - - - - $3,025 -
TOTAL RECOMMENDED $30,958 $43,000 $13,172
239,156
kWh
$4,671
-
kW-mo/yr
$8,880
-
gal
$(-180.0) $4,775 $(-360.0)
TOTAL IMPLEMENTED $5,971 $2,925 $2,933
53,342
kWh
$13
-
kW-mo/yr
- - $3,025 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs