ITAC Assessment: SF0334
ITAC logo
ITAC Assessment: SF0334
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Baked Cakes
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 91
Plant Area 77,000
ft2
Annual Production 1,400,000
units
Production Hrs. Annual 7,080
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $423,068 5,724,787
kWh
Electricity Demand $147,154 11,049
kW-mo/yr
Natural Gas $150,143 13,245
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,273 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.4133: Use most efficient type of electric motors $1,513 $460 $1,043
78,152
kWh
$470
-
kW-mo/yr
- -
02 2.2447: Heat water with exhaust heat $27,840 $27,600 - - $27,840
-
MMBtu
-
03 2.7111: Reduce illumination to minimum necessary levels $5,063 $5,347 $3,585
67,130
kWh
$1,478
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $455 $638 $263
4,928
kWh
$192
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,900 $7,407 $2,775
51,967
kWh
$1,125
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $451 $1,408 $260
4,878
kWh
$191
-
kW-mo/yr
- -
07 2.2628: Utilize a less expensive cooling method $27,971 $80,000 $20,153
428,477
kWh
$7,818
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $1,215 $4,750 $963
18,039
kWh
$252
-
kW-mo/yr
- -
09 2.7442: Keep doors and windows shut when not on use $1,759 $8,589 $1,759
32,938
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $631 $3,801 $400
7,489
kWh
$231
-
kW-mo/yr
- -
11 3.1161: Eliminate/reduce an operation $11,475 $16,945 - - - $11,475
TOTAL RECOMMENDED $82,273 $156,945 $31,201
693,998
kWh
$11,757
-
kW-mo/yr
$27,840
-
MMBtu
$11,475
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs