Assessment Year | 2006 |
---|---|
Principal Product | Baked Cakes |
NAICS | 311812: Commercial Bakeries |
SIC | 2051: Bread and Other Bakery Products, Except Cookies and Crackers |
Sales Range | $10 M to 50M |
# of Employees | 91 |
Plant Area |
77,000
ft2
|
Annual Production | 1,400,000
units
|
Production Hrs. Annual | 7,080
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $423,068 | 5,724,787 |
kWh
|
$0.074 |
Electricity Demand | $147,154 | 11,049 |
kW-mo/yr
|
$13.32 |
Natural Gas | $150,143 | 13,245 |
MMBtu
|
$11.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $82,273 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,513 | $460 |
$1,043
78,152
kWh
|
$470
-
kW-mo/yr
|
- | - | |
02 | 2.2447: Heat water with exhaust heat | $27,840 | $27,600 | - | - |
$27,840
-
MMBtu
|
- | |
03 | 2.7111: Reduce illumination to minimum necessary levels | $5,063 | $5,347 |
$3,585
67,130
kWh
|
$1,478
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $455 | $638 |
$263
4,928
kWh
|
$192
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,900 | $7,407 |
$2,775
51,967
kWh
|
$1,125
-
kW-mo/yr
|
- | - | |
06 | 2.7135: Install occupancy sensors | $451 | $1,408 |
$260
4,878
kWh
|
$191
-
kW-mo/yr
|
- | - | |
07 | 2.2628: Utilize a less expensive cooling method | $27,971 | $80,000 |
$20,153
428,477
kWh
|
$7,818
-
kW-mo/yr
|
- | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,215 | $4,750 |
$963
18,039
kWh
|
$252
-
kW-mo/yr
|
- | - | |
09 | 2.7442: Keep doors and windows shut when not on use | $1,759 | $8,589 |
$1,759
32,938
kWh
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $631 | $3,801 |
$400
7,489
kWh
|
$231
-
kW-mo/yr
|
- | - | |
11 | 3.1161: Eliminate/reduce an operation | $11,475 | $16,945 | - | - | - | $11,475 | |
TOTAL RECOMMENDED | $82,273 | $156,945 |
$31,201
693,998
kWh
|
$11,757
-
kW-mo/yr
|
$27,840
-
MMBtu
|
$11,475 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs