ITAC Assessment: TN0670
ITAC logo
ITAC Assessment: TN0670
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Uniforms
NAICS
n/a
SIC 2326: Men's and Boys' Work Clothing
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 100,000
ft2
Annual Production 488,000
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,267 788,980
kWh
Electricity Demand $13,515 3,908
kW-mo/yr
Electricity Fees $6,329 -
Natural Gas $42,738 6,593
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,662 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,164

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
01 3.5313: Increase amount of waste recovered for resale $30,906 $3,200 - - - $30,906
-
lb
-
02 4.322: Eliminate old stock and modify inventory control $20,663 $16,000 - - - - $20,663
03 2.7261: Install timers and/or thermostats $6,283 $3,000 $5,363
98,183
kWh
- $920
-
MMBtu
- -
04 2.2531: Re-size charging openings or add movable cover or door $640 $1,250 $640
11,723
kWh
- - - -
05 3.5212: Regrind, reuse, or sell scrap plastic parts $493 $625 - - - $493
-
lb
-
06 2.4314: Use synthetic lubricant $342 - $242
4,396
kWh
$100
-
kW-mo/yr
- - -
07 2.6218: Turn off equipment when not in use $335 - $335
12,309
kWh
- - - -
TOTAL RECOMMENDED $59,662 $24,075 $6,580
126,611
kWh
$100
-
kW-mo/yr
$920
-
MMBtu
$31,399
-
lb
$20,663
TOTAL IMPLEMENTED $38,164 $7,450 $6,338
122,215
kWh
- $920
-
MMBtu
$30,906
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs