Assessment Year | 2005 |
---|---|
Principal Product | packaged Produce |
NAICS | 115114: Postharvest Crop Activities (except Cotton Ginning) |
SIC | 0723: Crop Preparation Services for Market, Except Cotton Ginning |
Sales Range | $100 M to 500M |
# of Employees | 400 |
Plant Area |
250,000
ft2
|
Annual Production | 31,200,000
pieces
|
Production Hrs. Annual | 5,868
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,113,299 | 11,785,750 |
kWh
|
$0.094 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $190,901 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $190,901 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,330 | - |
$6,098
95,555
kWh
|
$3,232
-
kW-mo/yr
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $693 | - |
$693
10,858
kWh
|
- | |
03 | 2.4224: Upgrade controls on compressors | $38,413 | $22,423 |
$26,447
414,461
kWh
|
$11,966
-
kW-mo/yr
|
|
04 | 2.2114: Shut off steam traps on super heated steam lines when not in use | $1,035 | $760 |
$713
11,180
kWh
|
$322
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $38,810 | $45,147 |
$28,620
448,521
kWh
|
$10,190
-
kW-mo/yr
|
|
06 | 2.4133: Use most efficient type of electric motors | $6,420 | $6,885 |
$4,821
77,512
kWh
|
$1,599
-
kW-mo/yr
|
|
07 | 2.2628: Utilize a less expensive cooling method | $96,200 | $80,000 |
$71,758
1,124,552
kWh
|
$24,442
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $190,901 | $155,215 |
$139,150
2,182,639
kWh
|
$51,751
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $190,901 | $155,215 |
$139,150
2,182,639
kWh
|
$51,751
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs