ITAC Assessment: SF0309
ITAC logo
ITAC Assessment: SF0309
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product packaged Produce
NAICS 115114: Postharvest Crop Activities (except Cotton Ginning)
SIC 0723: Crop Preparation Services for Market, Except Cotton Ginning
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 250,000
ft2
Annual Production 31,200,000
pieces
Production Hrs. Annual 5,868
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,113,299 11,785,750
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $190,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $190,901

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $9,330 - $6,098
95,555
kWh
$3,232
-
kW-mo/yr
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $693 - $693
10,858
kWh
-
03 2.4224: Upgrade controls on compressors $38,413 $22,423 $26,447
414,461
kWh
$11,966
-
kW-mo/yr
04 2.2114: Shut off steam traps on super heated steam lines when not in use $1,035 $760 $713
11,180
kWh
$322
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $38,810 $45,147 $28,620
448,521
kWh
$10,190
-
kW-mo/yr
06 2.4133: Use most efficient type of electric motors $6,420 $6,885 $4,821
77,512
kWh
$1,599
-
kW-mo/yr
07 2.2628: Utilize a less expensive cooling method $96,200 $80,000 $71,758
1,124,552
kWh
$24,442
-
kW-mo/yr
TOTAL RECOMMENDED $190,901 $155,215 $139,150
2,182,639
kWh
$51,751
-
kW-mo/yr
TOTAL IMPLEMENTED $190,901 $155,215 $139,150
2,182,639
kWh
$51,751
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs