ITAC Assessment: SF0290
ITAC logo
ITAC Assessment: SF0290
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Non- carbonated beverages
NAICS 312111: Soft Drink Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 345,000
ft2
Annual Production 0
pieces
Production Hrs. Annual 4,500
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $430,575 4,003,070
kWh
Electricity Demand $218,465 17,308
kW-mo/yr
Natural Gas $939,680 132,325
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $248,615 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,641

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4131: Size electric motors for peak operating efficiency $13,186 - $9,476
88,151
kWh
$3,710
-
kW-mo/yr
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,309 - $4,733
43,993
kWh
- - - - $576
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,072 - $3,130
29,122
kWh
$942
-
kW-mo/yr
- - - -
04 2.2511: Insulate bare equipment $2,231 $617 - - $2,231
-
MMBtu
- - -
05 2.4239: Eliminate or reduce compressed air usage $15,496 $4 $12,649
117,668
kWh
$2,847
-
kW-mo/yr
- - - -
06 2.4133: Use most efficient type of electric motors $8,732 $2 $6,647
61,841
kWh
$2,085
-
kW-mo/yr
- - - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $20,456 $15 $16,298
151,254
kWh
$4,158
-
kW-mo/yr
- - - -
08 2.7134: Use photocell controls $708 $600 $435
4,050
kWh
$273
-
kW-mo/yr
- - - -
09 2.7142: Utilize higher efficiency lamps and/or ballasts $6,885 $6 $5,481
50,985
kWh
$1,404
-
kW-mo/yr
- - - -
10 2.2135: Repair and eliminate steam leaks $870 $1,019 - - $870
-
MMBtu
- - -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $643 $854 $490
4,554
kWh
$153
-
kW-mo/yr
- - - -
12 2.7135: Install occupancy sensors $494 $646 $344
3,203
kWh
$150
-
kW-mo/yr
- - - -
13 3.5132: Reuse rich white water in other applications $16,014 - - - - $16,014
-
Tgal
- -
14 3.6193: Install equipment (eg compactor) to reduce disposal costs $22,900 $20,000 - - - - $22,900
-
lb
-
15 2.8114: Change rate schedules or other changes in utility service $130,619 $218,815 $130,619
-
kWh
- - - - -
TOTAL RECOMMENDED $248,615 $242,578 $190,302
554,821
kWh
$15,722
-
kW-mo/yr
$3,101
-
MMBtu
$16,014
-
Tgal
$22,900
-
lb
$576
TOTAL IMPLEMENTED $23,641 $3,127 $18,130
168,626
kWh
$4,065
-
kW-mo/yr
$870
-
MMBtu
- - $576
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings