ITAC Assessment: SF0286
ITAC logo
ITAC Assessment: SF0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product wine
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $5
M
to 10
M
# of Employees 26
Plant Area 49,000
ft2
Annual Production 120,000
Tgal
Production Hrs. Annual 2,548
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,606 643,669
kWh
Natural Gas $11,599 1,341
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,756 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,133

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $522 - $522
3,184
kWh
-
02 2.4133: Use most efficient type of electric motors $871 $1,109 $871
5,307
kWh
-
03 2.2511: Insulate bare equipment $1,697 $829 $1,697
14,583
kWh
-
04 2.2621: Modify refrigeration system to operate at a lower pressure $9,389 $20,000 $9,389
57,231
kWh
-
05 2.7135: Install occupancy sensors $2,363 $7,431 $2,363
14,404
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $914 $4,363 $914
5,569
kWh
-
07 4.231: Purchase equipment instead of leasing $5,000 $5,500 - $5,000
TOTAL RECOMMENDED $20,756 $39,232 $15,756
100,278
kWh
$5,000
TOTAL IMPLEMENTED $8,133 $10,692 $3,133
23,336
kWh
$5,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs