ITAC Assessment: SD0098
ITAC logo
ITAC Assessment: SD0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Diagnostic Chemicals
NAICS
n/a
SIC 2833: Medicinal Chemicals and Botanical Products
Sales Range $5
M
to 10
M
# of Employees 92
Plant Area 59,630
ft2
Annual Production 4,000
lb
Production Hrs. Annual 2,340
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,652 2,474,209
kWh
Natural Gas $59,987 10,782
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $43,538 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,020

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3112: Store heated/ cooled water for use during peak demand periods $15,610 $32,459 $15,610
-
kWh
02 2.6212: Turn off equipment during breaks, reduce operating time $6,808 $5,000 $6,808
148,007
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $19,212 $15,000 $19,212
419,402
kWh
04 2.7111: Reduce illumination to minimum necessary levels $104 $27 $104
879
kWh
05 2.7132: Install timers on light switches in little used areas $1,627 $225 $1,627
15,826
kWh
06 2.7135: Install occupancy sensors $177 $353 $177
2,052
kWh
TOTAL RECOMMENDED $43,538 $53,064 $43,538
586,166
kWh
TOTAL IMPLEMENTED $26,020 $20,000 $26,020
567,409
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs