ITAC Assessment: LS2006
ITAC logo
ITAC Assessment: LS2006
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Plastics
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 14
Plant Area 19,000
ft2
Annual Production 5,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $107,569 1,128,320
kWh
TOTAL YEARLY COSTS $107,569
RECOMMENDED SAVINGS* $24,393 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $796 $300 $796
8,354
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,970 $1,800 $5,970
62,625
kWh
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,740 - $5,740
60,205
kWh
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $566 $375 $566
5,942
kWh
05 2.7135: Install occupancy sensors $31 $45 $31
328
kWh
06 2.6231: Utilize controls to operate equipment only when needed $1,553 $7,413 $1,553
16,286
kWh
07 2.2622: Replace existing chiller with high efficiency model $9,737 $81,000 $9,737
102,132
kWh
TOTAL RECOMMENDED $24,393 $90,933 $24,393
255,872
kWh
TOTAL IMPLEMENTED $13,072 $2,475 $13,072
137,126
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs