ITAC Assessment: SF0283
ITAC logo
ITAC Assessment: SF0283
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Frozen and Canned Food
NAICS 311422: Specialty Canning
SIC 2032: Canned Specialties
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area 100,000
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 5,880
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,004,637 8,631,330
kWh
Electricity Demand $238,634 18,916
kW-mo/yr
Natural Gas $367,504 54,759
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $384,226 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $136,081

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,759 - $2,759
30,923
kWh
- - -
02 2.4239: Eliminate or reduce compressed air usage $1,304 - $1,104
9,804
kWh
$200
-
kW-mo/yr
- -
03 2.6231: Utilize controls to operate equipment only when needed $1,636 $829 $1,697
14,583
kWh
$(-61.0)
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $33,377 $31,490 $28,383
243,878
kWh
$4,994
-
kW-mo/yr
- -
05 2.2621: Modify refrigeration system to operate at a lower pressure $61,990 $40,000 $53,976
463,775
kWh
$8,014
-
kW-mo/yr
- -
06 2.2414: Use waste heat from hot flue gases to preheat $19,808 $20,000 - - $19,808
-
MMBtu
-
07 2.2511: Insulate bare equipment $1,284 $1,218 - - $1,284
-
MMBtu
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $6,669 $10,828 $5,461
46,992
kWh
$1,208
-
kW-mo/yr
- -
09 2.7135: Install occupancy sensors $1,066 $2,688 $685
5,882
kWh
$381
-
kW-mo/yr
- -
10 3.2171: Use an automatic plate processor $27,300 $40,500 - - - $27,300
-
lb
11 2.8114: Change rate schedules or other changes in utility service $227,033 $40,600 $227,033
-
kWh
- - -
TOTAL RECOMMENDED $384,226 $188,153 $321,098
815,837
kWh
$14,736
-
kW-mo/yr
$21,092
-
MMBtu
$27,300
-
lb
TOTAL IMPLEMENTED $136,081 $127,553 $92,961
806,033
kWh
$14,536
-
kW-mo/yr
$1,284
-
MMBtu
$27,300
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs